Ajbarrister Posted April 20, 2008 Share Posted April 20, 2008 Rest of Pics. Link to comment Share on other sites More sharing options...
PeterM1 Posted April 20, 2008 Share Posted April 20, 2008 very nice rack, congrats! I noticed you run short by one device (sitting on top), is that a C4 matrix switch? How are the orange LEDs working out for you? Link to comment Share on other sites More sharing options...
Ajbarrister Posted April 20, 2008 Author Share Posted April 20, 2008 Yeah, we ran short. It was an oversight on my and my installer's part. It is a Audio Matrix switch. When we install the next zones of Music, we will need another C4 Amp, UPS and maybe another 300. So I will probably get a second rack for those three components with space to add several more componets for flexibility. Anyway, there was not really room (floor to ceiling) to put more euipment in the rack shown. Link to comment Share on other sites More sharing options...
shukic Posted June 28, 2008 Share Posted June 28, 2008 hiwhy i cant see any pics ?shuki Link to comment Share on other sites More sharing options...
thecodeman Posted July 1, 2008 Share Posted July 1, 2008 I dont see any either? Link to comment Share on other sites More sharing options...
wingzz Posted July 1, 2008 Share Posted July 1, 2008 Great Shotsj/k I can't see them either Link to comment Share on other sites More sharing options...
thecodeman Posted November 6, 2008 Share Posted November 6, 2008 Old post but the pictures work now Link to comment Share on other sites More sharing options...
c44me Posted November 6, 2008 Share Posted November 6, 2008 nicely done. good luck with that netgear switch - I just had 1 fry on me. Link to comment Share on other sites More sharing options...
takitezsdc Posted November 7, 2008 Share Posted November 7, 2008 Humm I might be out of line........but humm........You have all that packed into a tight area with power outlets that close to the system? Can you say hummmmmmm hummmmmmm..............AND a huge water pipe right on top of the system? wow...........humm Link to comment Share on other sites More sharing options...
Mav-Jason Posted November 7, 2008 Share Posted November 7, 2008 Well, maybe he's using the rack to heat the house with?J/K, looks nice man... and cooling fans can always be added if needed. Link to comment Share on other sites More sharing options...
Ajbarrister Posted November 8, 2008 Author Share Posted November 8, 2008 Thanks for the comments. The area where the rack sits (back) is a storage room that is 25 feet by 50 feet so there is a lot of room to breathe. Haven’t had any overheating problems yet. There is only one outlet really on the left. Two Pannamax max conditioners plug into that power outlet and then the ones you see on the right go to TV’s in the bedrooms and family room. The pipe concerned me a little, but it is a sewer pipe (waiting for the jokes) that services a wing of the house that’s rarely used. I figure if it pops I am in deep shit anyway! Love my insurance bill. LOL.Getting ready for phase two which includes:20 Dimmers9 Switches5- 3 Button Keypads8- 2 Button Keypads4- 6 Button keypadsGarage door- wireless relay and contactsFireplace automation keypad and dimmer2 wireless contacts for outside gates2 wireless contacts for screen door and sliding door2 table top kits for 2- 6 button keypads. Link to comment Share on other sites More sharing options...
Mav-Jason Posted November 8, 2008 Share Posted November 8, 2008 Wow nice 'phase two' there. No new controllers though? Big processing hit on all that. Link to comment Share on other sites More sharing options...
Ajbarrister Posted November 8, 2008 Author Share Posted November 8, 2008 I currently have a 500 and 3- 300's as slaves. When I do phase three I will be adding a 1000 since I will be doing another TV and 8 more zones of music, IP Cameras and security. Link to comment Share on other sites More sharing options...
Recommended Posts
Archived
This topic is now archived and is closed to further replies.